Monorail Drilling Unit 7600

The Monorail Drilling Unit 7600 was designed for blasthole drilling and roof bolting in both blasting and roadheader operations. It differs from the other GTA drilling units in that it is suspended from and travels on two overhead rails. The machine frame is positioned between the rails. Low overall height is thus an outstanding feature of this machine.

Advantages:

  • Drilling and roof bolting from the ′second work level′
  • Deployable at the face or as a back-up system
  • Owing to its low overall height it can also be used in roadheader operations
  • Available with integral work basket on request
  • Robust design suitable for mining applications

In the 7600B version the machine is fitted with a telescopic platform instead of a work basket.

Our staff will be happy to help should you require further information:

vertrieb@gta.eu or telephone: +49 (0) 2852-71012

 

 

More Media: